banner-img-mobile

Infrastructure Watch

Infrastructure Watch is a dashboard under publicfinance.lk that assesses proactive disclosure of information online in relation to large scale infrastructure projects that are currently being implemented. This is as per the requirement by the Right to Information (RTI) Act No. 12 of 2016.

banner-img

Infrastructure Project Disclosure Database

The database provides detailed findings of the proactive disclosure assessment of 60 on-going infrastructure projects. The 40 different types of information required to be disclosed by the implementing agencies are grouped into 5 broad categories: Project Details, Rationale & Beneficiaries, Budget & financial details, Approvals & Clearances, and Procurement & Contracts.
info-iconHover over data points to learn more
Data available
Data unavailable
Not Applicable
Project Name & Points Project Details Rationale & Beneficiaries Budget & Financial Details Approvals & Clearances Procurement & Contract
Development of 100,000 km of Alternative Roads to Access Main Roads and Expressway
Information Disclosed - 6/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Central Expressway Project Section - 1
Information Disclosed - 17/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of Passenger Terminal Building & Associated Works at Bandaranaike International Airport Phase II Stage 02 Package A
Information Disclosed - 7/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Port Access Elevated Highway
Information Disclosed - 14/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Support to Colombo Urban Regeneration Project
Information Disclosed - 6/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Kandy North Pathadumbara Integrated Water Supply Project
Information Disclosed - 15/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Kandy Tunnel Construction Project
Information Disclosed - 12/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Maduruoya Right Bank Development Project
Information Disclosed - 9/35
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Colombo Suburban Railway Development Project - Railway Efficiency Improvement Project
Information Disclosed - 10/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Housing for Conflict Affected Families in Northern and Eastern Province
Information Disclosed - 0/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Water supply to Kurunegala, Kandasale - Kandy East
Information Disclosed - 0/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Reduction of Landslide Vulnerability by Mitigation Measures
Information Disclosed - 8/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Greater Matale Water Supply Project Stage II
Information Disclosed - 2/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Bandarawela Water Supply Project phase I & II
Information Disclosed - 3/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Local Development Support Project (LDSP)
Information Disclosed - 7/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Baddegama Integrated Water Supply Project - Stage I
Information Disclosed - 5/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Integrated Watershed and Water Resources Management Project
Information Disclosed - 14/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Supply of Potable Water to the Jaffna Peninsula through the Development of Vadamarachchi Lagoon
Information Disclosed - 0/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Rural Tank Development Project under 'Wari Saubhagya Programme'
Information Disclosed - 6/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Primary Health systems strengthening Project (PSSP)
Information Disclosed - 4/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Development of Hospitals in Northern Province (DRIVE)
Information Disclosed - 8/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Design and Construction of Flyovers at Kohuwala and Gatambe under the Framework Credit Programme for Financial Cooperation - Hungarian Tiede Aid Loan. Soft Loan Schemendeur commericial credit facility
Information Disclosed - 6/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Slave Island- Uttarananda Mawatha, Justice Akbar Mawatha 02 Flyovers & Baladaksha Mawatha - Chitthampalam A Gardner Mawatha Flyover
Information Disclosed - 0/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Develop Gandara Fishery Habour
Information Disclosed - 12/35
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Hasalaka Water Supply Project (Water Supply Project)
Information Disclosed - 12/35
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of a Regasified Liquefied Natural Gas (R-LNG) pipeline from Floating Storage Regasification Unit Kerawalapitiya and Kelanitissa Power Plants
Information Disclosed - 6/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Base line Road - Phase III Kirulapona junction to Colombo - Horana Road
Information Disclosed - 9/35
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Rehabilitation of the A017 Corridor project (Rakwana - Suriyakanda)
Information Disclosed - 5/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Hapugasthalawa Water Supply Project
Information Disclosed - 4/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Ruwanwella Water Supply Expansion Project
Information Disclosed - 14/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Rehabilitation of Kudawilachchiya Reservoir
Information Disclosed - 12/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Infilling work of KRB Project Stage II in Kelaniya Region
Information Disclosed - 4/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of New Hospital to Sri Lanka Air Force (SLAF)
Information Disclosed - 8/34
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of well equipped 10 district based stroke centers and strengthening the A & E care services in hospitals
Information Disclosed - 6/34
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Doppler Weather Radar System
Information Disclosed - 4/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Establishment of ICT Hubs Secondary Education
Information Disclosed - 5/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Establish National Schools in Divisional Secretariate Divisions, where there is no national school
Information Disclosed - 3/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Nawalapitiya Pallegama Galabodaella Integrated Water Supply Project
Information Disclosed - 5/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Naula Wahakotte Water Supply Project
Information Disclosed - 5/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of a building at the Provincial General Hospitals Badulla
Information Disclosed - 1/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Upgrade Facilities of Secondary Schools to Establish 1000 National schools-Phase 01
Information Disclosed - 8/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Create Dedicated Zone for Textile Manufacturing and Related Industries Eravur
Information Disclosed - 9/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Kirama Katuwana Water Supply Project
Information Disclosed - 19/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Reconstruction of Jaffna Town Hall
Information Disclosed - 11/35
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Infilling Work of Gampaha, Attanagalla and Minuwangoda Integrated Water Supply Scheme
Information Disclosed - 1/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of seven oil tanks Kolonnawa Installation
Information Disclosed - 10/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Siyak Nagara Programme
Information Disclosed - 10/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Implementation of infilling work in ongoing Katana Water Supply Project Area - Stage III
Information Disclosed - 1/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Implementation of balance part of distribution network in ongoing Gampaha Attanagalla and Minuwangoda Integrated Water Supply Scheme
Information Disclosed - 1/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Loggaloya Water Supply Project
Information Disclosed - 1/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Develop Faculty of Allied Health Science at the Ruhunu University
Information Disclosed - 12/34
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Ella Wewa Reservoir
Information Disclosed - 12/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Welimada Stage II
Information Disclosed - 0/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Establishment of a professorial unit at Karapitiya hospital (University of Ruhuna)
Information Disclosed - 5/34
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of Synthetic track at Colombo - Torrington and Kurunagala - Maligapitiya playgrounds
Information Disclosed - 3/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of New Technology Concrete Panel Houses for Conflict Affected Families in Northern and Eastern Provinces
Information Disclosed - 0/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of Pre-Cast Disaster Resilient Houses for the People Residing in Disaster Prone Areas
Information Disclosed - 12/35
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Construction of Balapitiya Fishery Harbour
Information Disclosed - 0/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Establishment of Technology Faculty - Wayamba University
Information Disclosed - 6/36
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public
Water supply extension to Naddouththu and Surrounding areas from Muthu Water Supply Project
Information Disclosed - 6/37
Project description
Implementation ministry
Execution agency
Project location
Proposed commencement date
Projected conclusion date
Project Objectives Goals
Expected Project Outputs or Benefits
Target benefiaries stake holders
Is there a likelihood of any citizen being affected by the implementation of the proposed project?
If Yes, has adequate note been provided to them and/or have they been consulted in respect of the project?
If no, explain reasons for such omission
Provide details/description of steps being taken to provide compensation/reparations to affected parties
Project Justifation (financial and social cost benefit)
Total Estimated Costs
Agreed Amounts [state in currency payable as well as LKR equivalent]
Source of finance
If project implemented as a Public Private Partnership, provide the main terms and conditions of agreement between the Government and the private sector party, including details of profit sharing, financial information
Benefits or concessions to contractor at the expense of the Government to implement the project
Date of proposed project approval
Bid evaluations
Feasibility studies
Technical evaluations
Financial evaluations
Describe the Environmental Impacts on physical, biological, socio-cultural or aesthetic status, if any?
Has an environmental impact assessment been carried out
If yes, provide details of the institution that carried out the environmental impact assessment and date(s) of report(s)
If no, provide reasons for the omission
Have approvals from relevant regulatory agencies been obtained
If yes, from which agencies and dates of such approval
What approvals are pending
Is the project solicited or unsolicited
If unsolicited, please provide details of the project proponent, project proposal date
Name of the funder and conditions of financing of unsolicited proposal
Details of supplier/vendor/contractor to implement the project
Was the contract awarded?
If yes, date of execution of contract
If not, proposed date of execution of contract?
Number of bidders and name/contact detail of submitters
Complaints about the handling mechanism conforming to accepted standards of fairness and transparency
Indicate any complaints with handling mechanism conforming to accepted standards of fairness and transparency, which is accessible to the public